Roof Underlayment Flashing Install

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

Pin On Roof

Pin On Roof

Details That Matter On Asphalt Shingle Roofs Roof Installation Roof Shingles Fibreglass Roof

Details That Matter On Asphalt Shingle Roofs Roof Installation Roof Shingles Fibreglass Roof

Pin On Roof

Pin On Roof

Pin On Roof

Pin On Roof

Pin On Construction Details

Pin On Construction Details

Pin On Construction Details

In some situations you may have to temporarily remove the siding and replace it after installing the underlayment shingles and flashing.

Roof underlayment flashing install.

Then install shingles on the other side. Recommended procedures of basic valley flashing installation. Install underlayment a minimum of 6 inches up roof protrusions or vertical abutments. These pieces act as a weather proofing and protective barrier between your house and the elements helping keep water and cold temperatures out.

Lap successive sheets of metal flashing a minimum of 12 inches and seal laps. But first we re going to flash the eave with metal drip edge flashing and install the roofing membrane over it along the bottom edge of the roof. Pry away the siding and slip the felt under the siding. Fold the top over the roof ridge and cut the bottom along the drip edge metal.

In that installation the lower edge of the felt must be on top of not underneath the drip edge. Where the roof meets a wall lap the felt up 4 inches if possible. Seal with adhesive sealant or tape as described in section 6. Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.

Apply an approximately 3 inch. You ll have to overlap shingles as you go much like weaving. That is the drip edge flashing is the first item installed onto the roof sheathing or atop old shingles in a multi layer shingle re roof job. Again do not drive nails through flashing.

Installing roof felt is a two person job. Then install a non corrosive metal valley flashing of 24 minimum width. Cap staples are recommended on this underlayment every 12 inches along the bottom and every 24 inches in the middle. Start by laying asphalt felt or other underlayment over the roof.

Install synthetic roofing underlayment or felt paper according to manufacturer specifications and then install the first piece of valley flashing. Do not drive nails into the flashing. To make corner flashing take your tin snips and cut a 45 degree line from an outside corner to the center fold. Now it s time to install the underlayment and flashing.

Fasten drip edge on eaves with. Install an underlayment centered in the roof valley. With a clean valley you can lay down some peel and stick roofing membrane. Install final flashing material.

Heavy Membranes At Valley And Roof Deck Penetrations Building America Solution Center Roofing Roof Repair Diy Roof Repair

Heavy Membranes At Valley And Roof Deck Penetrations Building America Solution Center Roofing Roof Repair Diy Roof Repair

How To Roof A House Diy Roofing Roofing Home Construction

How To Roof A House Diy Roofing Roofing Home Construction

Pin On Skylite

Pin On Skylite

Pin On Roofing Details

Pin On Roofing Details

Source : pinterest.com